Showing posts with label joists. Show all posts
Showing posts with label joists. Show all posts

Monday, May 24, 2010

May 24, 2010: More of the same...

...just without the rain.


I wanted to share some of the detail work:

I love the pattern of the blocking!


I think these are the hurricane ties?


Very securely attached joists!


And ample crawl space (and playspace for grandchildren who may show up someday!).


And so here we are thus far.

Sunday, May 23, 2010

May 23, 2010: Blocking

Sunday was a pretty rainy day, but the guys stayed at it. They continued putting in the blocking and started installing the subflooring.


You can see the rain coming down in the last photo.

Saturday, May 22, 2010

May 22, 2010: Full Speed Ahead!

The guys finished placing the joists, put in the floor beams and cross beams on the side lanai, and put up the 6x6's on the makai side and front. Lots of very detailed, beautiful construction going on here! Jeff Ho'okano, the roofer, came by to consult with Jon regarding the roofing to be started Monday on the existing house, and Calvin Lam, the painter, came by to check what needed to be sealed in the lanai area.

Start of day...




We watched Charlie using this aMAZing tool to set the nails!


The head supervisor was on-site today, checking out the work.




It's starting to shape up quite nicely!


Oh, and Charlie even had enough time after work to check out the surf report!