Monday, July 19, 2010

July 19: Details, details

Eric and Darrin worked, but the only photo I got was of the water lily in our backyard. It's actually blooming! There's hope for that little plant. :)

July 18, 2010: The drywall board is up

It's beginning to look more like a house! Walls! (Sort of...)



I took the last one because I like the bird's foot corner detail. The 1x4 is cut like an arrow to fit just right. <___< (And yes that's the sky...)

[Postmark 7/26/10... I learned today that those boards are called "rafters," and those particular boards that I'm talking about are called a "valley rafter" and "jack rafters."

Sunday, July 18, 2010

July 17, 2010: Drywalling Begins

Didn't get to see Mark & Dustin in action today, but here are the results:

Odd perspective of the kitchen, but this way you can see the ceiling. And the second photo is the hallway, with the pantry opening to the left.


The Durock is in the two bathrooms. Stinky!

Friday, July 16, 2010

July 16, 2010: Inspection by the White Glove Guy

Eric stopped by with his nephew Jake to check out the insulation installation, and he and Bennett and Bobo tweaked the sound wiring a little bit.

He would be working, but he decided to go skateboarding Tuesday night and show up his cousins and, well...

It's only bruised, thank God, so he'll be back on the job on Monday. Good timing, since the drywallers will be here this weekend anyway.


(This is my art piece, "Contemplation of a Job Well Done Thus Far.") *teehee!*

Thursday, July 15, 2010

July 15, 2010: Insulation, Day 2... and the Sound System Wiring Contractor!

If you have ever visited Bennett's dental office, you are familiar with his wide array of music. So he hired an excellent sound system wiring guy to make sure that everything was done perfectly (and before the insulation guys returned!).




Mark & Dustin finished putting in the insulation. You can already tell the house is cooler!

Wednesday, July 14, 2010

July 14, 2010: Insulation Installation, Day 1

Mark & Dustin started putting in the insulation. That means inside walls soon!

Tuesday, July 13, 2010

July 13, 2010: More of the same

More caulking by Bruce, and more belly banding by Eric and Darren. And the insulation and dry wall was delivered today.